western range iron ore project in liberia

western range iron ore project in liberia

  • potential iron ore British Geological Survey

    the Western Range Project (WRP) operated by ArcelorMittal. At present iron ore is mined from two depositsMount Tokadeh in the WRPwhich produced 4.9 million tonnes in 2014 (ArcelorMittal2015)and the Bong mineoperated by China Unionwhich recorded its first production of 50 000 tonnes in early 2014. In 2013Liberia was ranked the 24th largest producer of iron ore in the world

    Live Chat
  • Western Range DSO Iron Ore Project liberia.arcelormittal

    ArcelorMittal Liberia Limited Western Range DSO Iron Ore Project Environmental and Social Impact Assessment Overview September 2010 Page 2 of 8 Overview of the Project The main report (Volume 1) contains a summary of the findings of the environmental and social impact assessmentthe recommendations for mitigation and the framework ESMP. Volume 2 contains a legal and

    Live Chat
  • Nimba Western Range Iron Ore Project Liberia

    Mining at Mount Tokadehin Nimba CountyLiberiatook place between 1973 and the early 1990slinked to iron ore mining in the East Nimba Range carried out by LAMCO and then LIMINCO. Mining at Tokadeh is currently undertaken as part of ArcelorMittals Phase 1 Direct

    Live Chat
  • Western Range Iron Ore Project Liberia Project

    CivilElectroMechanical works including Mining Plant and Material handling system for Western Range DSO Iron Ore ProjectLiberia (Client: ArcelorMittal Ltd. and Engineer: SNC Lavalin Inc. Canada) as a Sr Planning Engineer from 1 Jan 2011 to 5 th December 2011:

    Live Chat
  • Liberia (AF.LR) Project Controls planningscheduling

    CivilElectroMechanical works including Mining Plant and Material handling system for Western Range DSO Iron Ore ProjectLiberia (Client: ArcelorMittal Ltd. and Engineer: SNC Lavalin Inc. Canada) as a Sr Planning Engineer from 1 Jan 2011 to 5 th December 2011:

    Live Chat
  • Western Range DSO Iron Ore Project Volume 3Part 1.1

    ArcelorMittal Liberia Limited Western Range DSO Iron Ore Project _____ Environmental and Social Impact Assessment Volume 3Part 1.1: Terrain and Soils Baseline September 2010 Page 5 of 112 1. Introduction ArcelorMittal Liberia proposes to reinstate and